| 16 January 2012 Minutes | 102.54 KB |
| 16 January 2012 Entry Facility Technical Specification (Revised in light of discussion during meeting) | 636.53 KB |
| 12 January 2011 Lewa Biomethane Odorant Systems (provided by REA) | 2.08 MB |
| 10 January 2012 Packaging Bio-Methane Connections (provided by National Grid) | 2.88 MB |
| 09 January 2012 Accuracy of CV determination systems (provided by Dave Lander) | 110.36 KB |
| 03 January 2012 Specification of Water dew temperature of biomethane (provided by Dave Lander) | 109.78 KB |
| 03 January 2012 Generic biomethane injection measurement risk assessment (provided by Dave Lander) | 125.39 KB |
| 20 December 2011 Agenda | 47.35 KB |