Last updated:
7 December, 2023
Proposer
Centricia
Impacted codes
None
Modification type
Authority Direction
Status:
Implemented
Impact:
Low impact: National Transmission System, Shippers
High impact: Centrica Storage Limited, Rough Storage
This modification proposal will ensure entry capacity holdings at the Easington ASEP can be utilised at the Rough Storage ASEP during Winter 2023/24 in the same way as they were during Winter 2022/23. An enhancement has been proposed to permit any User which secures Rough Storage Capacity is able to redesignate Easington Entry Capacity to the Rough ASEP.
Timeline
Panel Assessment
Yes
Status
New Modification considered by Panel
New Modification considered by Panel
Workgroup Report Due
Yes
17/08/2023
Status
Workgroup Report considered by Panel
Consultation
Completed
21/07/2023
10/08/2023
Consultation - Final Modification Report
Yes
14/08/2023
Status
Final Modification Report available for Panel
Panel Decision
Yes
17/08/2023
Status
Modification Panel Decision
Implementation
Completed
25/09/2023