| 15 January 2010 Minutes | 99.29 KB |
| 13 January 2010 Ofgem RIA - Consideration of Mod 0229 (provided by National Grid Distribution) | 512.5 KB |
| 13 January 2010 Agenda | 82.38 KB |
| 13 January 2010 Long Term Vacants Proposal v2 (provided by Scottish Power) | 378.5 KB |
| 07 January 2010 NDM Demand Estimation Sample Report Presentation (provided by Scotia Gas Networks) | 261.5 KB |
| 07 January 2010 Example of NDM Demand Estimation Sample Report (provided by Scotia Gas Networks) | 23 KB |
| 07 January 2010 NDM Demand Estimation Sample Report Example Email (provided by Scotia Gas Networks) | 45.48 KB |
| 07 January 2010 NDM Demand Estimation Sample Report File Format (provided by Scotia Gas Networks) | 21.5 KB |
| 11 December 2009 Removal of Bottom Stop SOQ (provided by National Grid Distribution) | 113.5 KB |
| 11 December 2009 BSSOQ Removal (presentation provided by National Grid Distribution) | 488 KB |
| 08 December 2009 Draft Workstream Report 0271 | 133.39 KB |
| 04 December 2009 NTS Exit Capacity Credit Arrangements (provided by Wales & West Utilities) | 509 KB |
| 26 November 2009 Draft Workstream Report 0248 | 132.73 KB |