| 05 March 2010 Minutes | 185.48 KB |
| 04 March 2010 Mod 0273: DN Connection Process (provided by Northern Gas Networks) | 524.5 KB |
| 03 March 2010 Project Discovery (provided by Ofgem) | 1.02 MB |
| 03 March 2010 Mod 0273: Customer Experiences (provided by AEP) | 138 KB |
| 02 March 2010 Draft Modification Proposal: Removal of the WDDSEC Zero Reserve Price | 178.96 KB |
| 02 March 2010 Draft Modification Proposal: UIOLI Release Trigger | 213.86 KB |
| 02 March 2010 Draft Modification Proposal: To determine the amount of Annual NTS Exit Flat Capacity | 54.8 KB |
| 02 March 2010 Draft Modification Proposal: To facilitate the release of additional NTS Exit Flat capacity at National Grid NTS's discretion | 50.83 KB |
| 02 March 2010 Draft Modification Proposal: Facilitating the Reduction of Enduring Annual NTS Exit Flat Capacity by a value less than 100000 kWh | 48.15 KB |
| 02 March 2010 Draft Modification Proposal: Change System Capacity Transfers Notification Time Limit from 0400 to 0300 | 66.62 KB |
| 02 March 2010 Mod 0273: An additional draft solution (provided by National Grid NTS) | 34.83 KB |
| 01 March 2010 Linepack Service - Conceptual Issues | 268.95 KB |
| 25 February 2010 Time Cost Matrix | 375.5 KB |
| 25 February 2010 Initial Enquiry Form for NTS Connection and or NTS Exit Capacity | 101.5 KB |
| 25 February 2010 Mod 0273 National Grid Presentation | 791 KB |
| 24 February 2010 Agenda | 60.3 KB |