This Modification proposes that where a Class 2, 3 or 4 Supply Meter Point has met the requirement to become Class 1 because its AQ has exceeded 58,600,000 kWh for the duration specified in G1.6.15, and the Shipper has not converted it to Class 1 by 20 Supply Point System Business Days (SPSBD) after the existing deadline (2 months after Class 1 Read Requirements have been met), then the CDSP will convert the Supply Meter Point to Class 1.
The Modification also proposes new Performance Assurance Committee (PAC) reports (with corresponding anonymised reports) in the Performance Assurance Report Register (PARR) of Supply Meter Points not in Class 1 that are above the Class 1 AQ threshold, and of Supply Meter Points that have been reclassified to Class 1 by the CDSP over the previous 12 months.
Timeline
Initial consideration by Workgroup
Final Modification Report available for Panel
Modification Panel decision